We build solidly. We consolidate sustainably.

Stral big construct

Projects

Design and execution of modular cylindrical steel tanks, above-ground mounted on reinforced concrete foundations, for fire water storage and pump room, capacities of 702 m³ and 850 m³.

Shoring works, repairs, and strengthening in the underground parking, as well as intervention and repair works in the outdoor parking area.

Construction of a Social Canteen, fencing, land systematization, and utility connections.
Beam strengthening with carbon fiber and design and execution of industrial flooring for the project “CONSTRUCTION OF AN INDUSTRIAL PRODUCTION, STORAGE AND ADMINISTRATIVE COMPLEX,” Sandulesti.

Realizăm pardoseli industriale și platforme exterioare din beton, adaptate cerințelor specifice fiecărui proiect. Executăm lucrări durabile, cu rezistență ridicată la trafic intens, uzură și factori de mediu, utilizând soluții tehnice moderne și materiale de calitate. Asigurăm atât turnarea, cât și finisarea profesională a suprafețelor, pentru rezultate fiabile și de lungă durată.

Printre proiectele realizate se numără:

  • Metro Suceava
  • Metro Iasi
  • Karcher Curtea de Arges
  • Lidl Obor, Mizil, Curtea de Arges, Valea Oltului, Slatina
  • Kaufland Pantelimon, Zalau, Mizil, Basarabiei
  • New Cold Stefanesti
  • Carnia Mizil
  • Corso Chitila
  • Arabesque Chitila
  • VGP Stefanesti
  • Rocombi

Stabilizăm pardoselile existente prin montarea de cilindri stabilizatori și injectări specializate, intervenții eficiente pentru zonele afectate de tasări sau pierderi de rezistență. Lucrăm rapid și cu impact minim asupra activității, oferind soluții practice care readuc suprafețele la un nivel sigur și stabil, fără lucrări complicate de refacere.